jz
LINKS:
[1] 12-09-07 The ongoing US-Israeli love affair – a) Histroic perspective
[2] 12-09-07 the Ongoing US-Israeli Love Affair, b) Landmark Events in Unannounced Regime Change in Israel
[3] 12-09-10 the Ongoing US-Israeli Love Affair, c) Landmark Events in Unannounced Regime Change in Israel (2012)
_______________________
Mysterious 'Site 911' in Israel Raises Eyebrows
U.S. Army Corps plans to supervise construction of a five-story underground facility for an IDF complex, oddly named “Site 911.”
By Rachel Hirshfeld First Publish: 11/30/2012, 11:18 AM
US-Israel joint military exercise
Flash 90
The U.S. Army Corps of Engineers plans to supervise construction of a five-story underground facility for an Israel Defense Forces complex, oddly named “Site 911,” at an Israeli Air Force base near Tel Aviv.
“Expected to take more than two years to build, at a cost of up to $100 million, the facility is to have classrooms on Level 1, an auditorium on Level 3, a laboratory, shock-resistant doors, protection from nonionizing radiation and very tight security. Clearances will be required for all construction workers, guards will be at the fence and barriers will separate it from the rest of the base,” The Washington Post reported.
Security concerns at the site are so great that non-Israeli employees hired by the builder can come only from “the U.S., Canada, Western Europe countries, Poland, Moldavia, Thailand, Philippines, Venezuela, Romania and China,” according to a Corps notice.
“The employment of Palestinians is also forbidden,” it says.
According to security regulations, the site “shall have one gate only for both entering and exiting” and “no exit or entrance to the site shall be allowed during work hours except for supply trucks." Guards will be Israeli citizens with experience in the Israeli air force. Also, “the collection of information of any type whatsoever related to base activities is prohibited.”
According to The Washington Post the Corps also offered a “lengthy description” of the mezuzas the contractor is to provide “for each door or opening exclusive of toilets or shower rooms” in the Site 911 building.
The Corps notes that the mezuzas “shall be written in inerasable ink, on . . . uncoated leather parchment” and be handwritten by a scribe “holding a written authorization according to Jewish law.” The writing may be “Ashkenazik or Sepharadik” but “not a mixture” and “must be uniform.”
It ads that the mezuazs “shall be proof-read by a computer at an authorized institution for Mezuzah inspection, as well as manually proof-read for the form of the letters by a proof-reader authorized by the Chief Rabbinate."
Furthermore, all mezuzas for the facility “shall be affixed by the Base’s Rabbi or his appointed representative and not by the contractor staff.”
Site 911 is the latest in a long history of military construction projects the United States has undertaken for the IDF under the U.S. Foreign Military Sales program.
The 1998 Wye River Memorandum between Israel and the Palestinian Authority led to about $500 million in U.S. construction of military facilities for the Jewish state, most of which were initially based in an undeveloped part of the Negev Desert.
According to Corps publication, over the years it has built underground hangars for Israeli fighter-bombers, facilities for handling nuclear weapons (though Israel does not admit having such weapons), command centers, training bases, intelligence facilities and simulators.
The Pentagon on Tuesday inquired into the purpose of the mysterious Site 911, but the Corps said on Wednesday said that only an Israeli Defense Ministry spokesman could provide an answer, The Washington Post reported.
_______
_______
US building a Secret $100m underground building in Tel Aviv called 911
"Leave it to legendary Walter Pincus from the Washington Post to flesh out a Request for Proposal construction project planned for Israel called Site 911.The oddly named project will cost up to $100 million, take more than two years to complete, and can only be built by workers from specific countries with proper security clearances. Palestinians need not apply.
When complete the well-guarded compound will have five levels buried underground and six additional outbuildings on the above grounds, within the perimeter. At about 127,000 square feet, the first three floors will house classrooms, an auditorium, and a laboratory — all wedged behind shock resistant doors — with radiation protection and massive security.Only one gate will allow workers entrance and exit during the project and that will be guarded by only Israelis.The bottom two floors are smaller, according to the full line of schematics uploaded to the Army's Acquisition Business Web Site, and possibly used for equipment and storage.
As impressive as the American design features already are, Ada Karmi-Melamede Architects will decorate the entire site with rocks it chooses, but are paid for by the contractor, and provide three outdoor picnic tables.
Pincus also found this detailed description of the mezuzahs that will adorn every door in the facility:These mezuzas, notes the [US Army] Corps, “shall be written in inerasable ink, on . . . uncoated leather parchment” and be handwritten by a scribe “holding a written authorization according to Jewish law.” The writing may be “Ashkenazik or Sepharadik” but “not a mixture” and “must be uniform.”Also, “The Mezuzahs shall be proof-read by a computer at an authorized institution for Mezuzah inspection, as well as manually proof-read for the form of the letters by a proof-reader authorized by the Chief Rabbinate.” The mezuza shall be supplied with an aluminum housing with holes so it can be connected to the door frame or opening. Finally, “All Mezuzahs for the facility shall be affixed by the Base’s Rabbi or his appointed representative and not by the contractor staff.”Along with this request is another called 911 Phase 2.Also in the $100 million range, Pincus finds the “complex facility with site development challenges” requiring services that include “electrical, communication, mechanical/ HVAC [heating, ventilation, air conditioning] and plumbing” requirements telling; and along with the fact that the contractor must posses a U.S. or Israeli Secret Security Clearance, he believes this phase to be a secure command center.Pulitzer Prize winning, Yale grad, born in 1932 whose worked intelligence and media in D.C. since 1955 closes his piece with these shadowy words.""The purpose of Site 911 is [un] clear."
No comments:
Post a Comment